0
Skip to Content
Timberlake Watershed Improvement District
Home
TWID Messages
Annual Reports
About
Formation of the TWID
Lake History
Projects
Projects
Management of Dredging Project
FAQs
Activities Timeline_Project Completion Update
Project 1-photo gallery
Future Projects
WID Financing
Project Financing and TWID Tax
WID Tax FAQs-2023
Financial Reports
Trustees
Reference Documents
Dredge Area Maps
Document Library
Contact Us
Timberlake Watershed Improvement District
Home
TWID Messages
Annual Reports
About
Formation of the TWID
Lake History
Projects
Projects
Management of Dredging Project
FAQs
Activities Timeline_Project Completion Update
Project 1-photo gallery
Future Projects
WID Financing
Project Financing and TWID Tax
WID Tax FAQs-2023
Financial Reports
Trustees
Reference Documents
Dredge Area Maps
Document Library
Contact Us
Home
TWID Messages
Annual Reports
Folder: About
Back
Formation of the TWID
Lake History
Folder: Projects
Back
Projects
Management of Dredging Project
FAQs
Activities Timeline_Project Completion Update
Project 1-photo gallery
Future Projects
Folder: WID Financing
Back
Project Financing and TWID Tax
WID Tax FAQs-2023
Financial Reports
Trustees
Folder: Reference Documents
Back
Dredge Area Maps
Document Library
Contact Us
Lake closed during dredge operation. Notices posted around dredge material storage site for safety.
Pre-dredge. Site preparation
Location: Lot adjacent to Timberlake Pavilion. Preparation of site to deposit dewatered dredge material.
Dredge equipment "Miss Anny" placed in lake via crane
Barge "Poseidon" with hydraulic pump placed in lake via large crane.
Poseidon barge with dredge pipe moved to first position
Dredge line markers placed in coves mark outline of zones where silt is to be removed.
Dredge line markers placed in coves mark outline of zones where silt is to be removed.
148289405_10225705385926455_2129859715709886583_n.jpg
179095252_10226326107404104_497473970889395743_n.jpg
179423182_5282685781805846_6347719375003562945_n.jpg
Miss Anny, with dredge arm, in action. Pipe at rear sends silt to Poseidon barge.
Floats and turbidity curtain set to catch material loosened during dredging
Miss Anny, with dredge arm, in action. Pipe at rear sends silt to Poseidon barge. Pump on Poseidon sends dredge material to dewatering station at the Pavilion lot.
Dredge operation clears significant silt from one feeder creek as it enters the main lake.

Timberlake WID